amos fitzgerald
amos fitzgerald

Residential Rough-in Construction

This is the interior of a wooden structured residential property under construction. The wood frame erection and wall insulation filling have been finished, and the layout of water supply and drainage pipes as well as electrical circuits is in progress. Electrical facilities including distribution boxes have been pre-installed, the ground is unfinished base plates with reserved door and window openings. It is the pipeline embedding stage before interior decoration, and wall and floor finishing work has not been carried out yet.

Residential Construction

Plumbing Electrical Installation

Wooden Structure Building

Insulation Construction

Pre-decoration Stage

9
Modified at 2026-07-09 08:40
Input source
File type
Video
Duration
17min42s
File size
2.13 GB
3DGS model
Type
Indoor
Quality
Standard