amos fitzgerald
amos fitzgerald

Residential Rough-in Construction

This is the interior of a wooden structured residential property under construction. The wood frame erection and wall insulation filling have been finished, and the layout of water supply and drainage pipes as well as electrical circuits is in progress. Electrical facilities including distribution boxes have been pre-installed, the ground is unfinished base plates with reserved door and window openings. It is the pipeline embedding stage before interior decoration, and wall and floor finishing work has not been carried out yet.

Residential Construction

Plumbing Electrical Installation

Wooden Structure Building

Insulation Construction

Pre-decoration Stage

9
修改于 2026-07-09 08:40
输入源
文件类型
视频
视频时长
17min42s
文件大小
2.13 GB
3DGS模型
类型
室内
质量
标准