This is the interior of a wooden structured residential property under construction. The wood frame erection and wall insulation filling have been finished, and the layout of water supply and drainage pipes as well as electrical circuits is in progress. Electrical facilities including distribution boxes have been pre-installed, the ground is unfinished base plates with reserved door and window openings. It is the pipeline embedding stage before interior decoration, and wall and floor finishing work has not been carried out yet.