This is an indoor residential space during the construction phase. The walls built of red bricks have been completed, white circuit pipelines are pre-embedded on the wall surface, and keel frames are installed in some areas to prepare for subsequent finishing construction. There is an entrance door with unremoved protective film at the end of the corridor, and temporary chairs are placed on the site. The whole space is in the early construction state of rough decoration.